17.25.040 Final plat and final short plat engineering plan review requirements.
(1) Engineering plans for roads, drainage controls and other proposed or conditioned improvements shall be prepared, submitted and reviewed for approval by the Development Engineer prior to the commencement of on-site clearing or construction activities.
(2) Approval of the engineering details of the proposed sanitary sewer and water systems and other proposed public facilities by the applicable utility agency, Development Engineer and the King County Department of Public Health will be required prior to the approval of the final plat.
(3) Plans and technical information reports shall be submitted to the Department and prepared consistent with the requirements of the City of Covington Street Standards, Chapter 12.60 CMC, the stormwater manuals adopted pursuant to Chapter 13.25 CMC, and conditions of preliminary approval. Each plan set or document shall be stamped, signed and dated by a civil engineer.
(4) Prior to approval of engineering plans, the applicant shall post a site restoration guarantee consistent with the provisions of this title and CMC Title 14, and shall pay all applicable fees pursuant to this title and the current fee resolution. (Ord. 13-19 § 7; Ord. 13-09 § 24; Ord. 20-07 § 104; Ord. 53-02 § 2 (19A.16.040))