Skip to main content
Loading…
This section is included in your selections.

Financial guarantees shall be required consistent with the provisions of CMC Title 14.

(1) Prior to receiving a temporary or permanent occupancy certificate for any building or structure for which landscaping is required, an applicant shall provide a performance guarantee adequate to secure the completion and improvement of required landscaping, in accordance with the approved site plan, within three months following issuance of the building or buildings temporary or permanent occupancy certificate, whichever comes first.

(2) Performance guarantees for landscaping shall be sufficient to cover the cost of conformance with conditions of the permit, and shall be required for a period of two years after the planting or transplanting of vegetation to insure proper installation, establishment and maintenance. This time period may be extended by one year by the Director, if necessary to cover a planting and growing season.

(3) The Director may extend the time limit for compliance with the above landscaping requirement up to one year after issuance of the occupancy certificate if circumstances beyond the control of the applicant warrant an extension. The request for an extension shall be in writing, accompanied by a fee for the extension request as set forth in the current fee resolution, and a schedule for completion of remaining work.

(4) Fees. Landscaping installation inspections, performance guarantee release inspections, and requests for extensions are subject to fees as set forth in the current fee resolution. (Ord. 20-07 §§ 85, 118; Ord. 43-02 § 2; Ord. 42-02 § 2 (21A.16.190))

Partially from former 14.110.070.