All new development proposals shall be served by a water supply system as follows:

(1) A public water system is adequate for a development proposal; provided, that:

(a) For the issuance of a building permit, preliminary plat or short plat approval or other land use approval, the site of the proposed development can be served by a water system consistent with CMC Title 13.

(b) Prior to issuance of a certificate of occupancy for a building or change of use permit, the approved public water system and any system improvements set forth in subsection (1)(a) of this section shall be installed to serve each building or lot.

(c) For recording a final plat, final short plat or binding site plan, either the approved public water supply system or system improvements set forth in subsection (1)(a) of this section shall be installed to serve each lot.

(d) For a zone reclassification, the timing of installation of required water system improvements shall be included in the approving ordinance. (Ord. 19-17 § 3; Ord. 42-02 § 2 (21A.28.040))