(1) Upon filing of a complete application, payment of the fee, and posting of the required financial guarantee for construction, maintenance, and restoration of the right-of-way consistent with this code, the City may issue a permit authorizing the use of City’s road right-of-way for use by designated private parties for a specific use which is less than 180 days in duration.

(2) The permit may require construction and restoration of the right-of-way to adopted standards based on the nature and duration of the specific use, and subject to Department inspection. In addition, conditions may be set to assure the compliance with City plans, policies, standards and regulations. Such conditions may require performance in excess of adopted road standards.

(3) The permit applicant shall assume sole responsibility for the safe and adequate operation and maintenance of any improvements to the City right-of-way during the period of time the permit is in effect.

(4) The permit applicant may apply for a single 180-day extension to the right-of-way use permit, upon written application for an extension, payment of the fee for a request for extension as set forth in the current fee resolution, and being found to have fully complied with the conditions and requirements of the original permit. The application for extension may be made only after the first 90 days of the original permit life. (Ord. 20-07 § 8; Ord. 38-02 § 2 (12.07.050))