(1) No work related to permanent or temporary storm drainage control for a permitted development may proceed without the approval of the Director of Community Development.

(2) Erosion and sediment control measures associated with both the interim and permanent drainage systems shall be:

(a) Constructed in accordance with the approved plan prior to any grading or land clearing other than that associated with an approved erosion and sediment control plan; and

(b) Satisfactorily sequenced and maintained until all improvements, restoration, and landscaping associated with the permit and approvals for the project are completed and the potential for on-site erosion has passed.

(3) Prior to the construction of any improvements or buildings on the site, or to final recording of a plat or short plat, those portions of the drainage facilities necessary to accommodate the control of surface and stormwater runoff discharging from the site shall be constructed and in operation, but, after receipt of a written request, the Development Review Engineer may authorize recording to minimize impacts that may result from construction during inappropriate times of the year. (Ord. 13-09 § 10 (Exh. 2); Amended at request of department 2/08; Ord. 37-02 § 2 (9.04.090))